Project co-financed by POIM 2014 – 2021 Axis 11.1
Energy Efficiency Measures through the Replacement of the Lighting System at COMELF SA
Project co-financed by the European Regional Development Fund through the Large Infrastructure Operational Program 2014–2020.
PROJECT: “Energy Efficiency Measures through the Replacement of the Lighting System at COMELF SA”
MY SMIS 2014+ Code: 160703
BENEFICIARY: COMELF SA
PROJECT OBJECTIVES:
The general objective of the project is to increase the energy efficiency of COMELF SA by implementing energy efficiency measures and reducing specific energy consumption in buildings, such as replacing lighting fixtures.
The project objectives are closely linked to the specific objective of the “Large Infrastructure Operational Program” (POIM 2014–2020), Priority Axis 11 – Measures to improve energy efficiency and encourage the use of renewable energy at the enterprise level, Investment Priority 11.1 – Energy efficiency and the use of energy from renewable sources for self-consumption at the enterprise level, namely ensuring energy efficiency at the building level and reducing energy consumption.
Specific objectives of the project:
- Increase the energy efficiency of COMELF SA by implementing energy efficiency measures and reducing specific energy consumption in buildings, specifically by replacing mercury vapor or metal halide lighting fixtures with LED lighting fixtures.
- Reduce electricity consumption after project implementation by 65.35% compared to the reference year within the energy boundary defined in the energy analysis.
- Reduce greenhouse gas emissions as a result of the investment project by 65.35% compared to the reference year, within the energy boundary defined in the energy analysis.
EXPECTED RESULTS:
- Energy efficiency measures implemented in buildings through the replacement of mercury vapor or metal halide lighting fixtures with LED fixtures.
- Electricity consumption reduced during the project implementation period by 65.35% compared to the initial situation (2021) within the energy boundary defined in the energy analysis.
- Greenhouse gas emissions reduced by 65.35% compared to 2021 as a result of implementing the investment project, within the energy boundary defined in the energy analysis.
TOTAL PROJECT VALUE: 1,110,499.22 RON
NON-REIMBURSABLE PROJECT VALUE: 845,016.39 RON representing non-reimbursable financing (718,263.93 RON from ERDF + 126,752.46 RON from the national budget).
PROJECT START DATE: 08.03.2023
PROJECT END DATE: 31.12.2023
For detailed information about other European Union co-financed programs, please visit www.fonduri-ue.ro
Contact person: Bucur Ionela
Position: Project Manager / Expert in Accessing European Structural and Cohesion Funds
Tel: +40 756 090 852
Fax: +40 263 238 092
E-mail: bucur.ionela@comelf.ro
The content of this material does not necessarily represent the official position of the European Union or the Government of Romania.